(Summary description)The planning of the painting equipment process layout is critical to the application of the painting production line. If the process layout of the coating equipment is not appropriate, even if each single equipment is manufactured well, the entire coating production line will not be easy to use

Painting equipment process layout

(Summary description)The planning of the painting equipment process layout is critical to the application of the painting production line. If the process layout of the coating equipment is not appropriate, even if each single equipment is manufactured well, the entire coating production line will not be easy to use

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2019-12-05
  • Views:0
Information

The planning of the painting equipment process layout is critical to the application of the painting production line. If the process layout of the coating equipment is not appropriate, even if each single equipment is manufactured well, the entire coating production line will not be easy to use。

Here are the typical faults common in the layout of coating equipment processes:

1. The output value fails to meet the planning outline: some plans do not consider the painting equipment hanging method, do not consider the hanging distance, do not consider the ups and downs, horizontal turning dry, and do not consider the scrap rate, painting equipment utilization rate, Product peak production ability. As a result, the output value does not reach the planning outline.

2. The coating equipment process is not available at all times: In some plans, in order to reduce the cost, the process time is reduced to achieve the intention. Common examples are: the pre-treatment transition period of the coating production line is not working at all times, causing liquid leakage; the temperature rise time is not considered during curing, which causes poor curing; the paint spray leveling is not working, resulting in paint film leveling; cooling after curing is not possible, spray painting (or (Next piece) The workpiece is too hot.

3. Improper planning of transport equipment: There are many ways to transport workpieces. Improper planning can have adverse consequences on production ability, process operation, and loading and unloading. Commonly, there are suspension chains for transportation, and the load ability and traction ability need to be calculated and dried and plotted. The speed of the chain also requires corresponding equipment. The coating equipment also requires the stability and synchronization of the chain.

4. Incorrect selection of coating equipment: Due to different product requirements, equipment selection is also different, and various coating equipment has its advantages and disadvantages. However, the user cannot be clarified when planning, and found to be very unsatisfactory after manufacturing. For example, the air curtain is used for dusting and drying tunnels, and the cleanliness-required workpieces are not equipped with purification equipment. This type of fault is the most common fault in the layout of painting equipment processes.

Scan the QR code to read on your phone

底部

phone station

Contact Anjia

Address: 33 Chuangye West Road, Xinbei District, Changzhou City, Jiangsu Province

Phone: +86 0519-85971117

Fax: +86 0519-85971122

Contact: Mr. Chen

Mobile phone: +86 13861260363

Post code: 213126

Copyright © 2019 Changzhou Anjia Coating Equipment Co., Ltd.    Powered by www.300.cn   苏ICP备20003211号-1